From Tuesday, November 9 through Friday, November 20, Virginia Concrete Construction will be working on W. Washington St. between Spring St. and Rawlings La. replacing the sidewalk and curb on both sides of the street. They will close the right lane eastbound and the right lane westbound from 7:00 AM to 4:00 PM. The work is to replace the sidewalk and curb at the old railroad crossing.